< img height="1" width="1" style="display:none" src="https://www.facebook.com/tr?id=2433975083660159&ev=PageView&noscript=1" />

[Polyester Bottle Sheet] Device Dynamics of Chinese Polyester Bottle Sheet Enterprises

92,448
October 31, 2023, 11:13 AM

enterprises

Production capacity (10,000 tons)

maintenance plan

China Resources Jiangyin

120

One set of 600,000-ton units was shut down for maintenance in early October, and the other set of 600,000-ton units was started at a low level

Yizheng chemical fiber

45

A 150,000-ton unit was switched to production and sliced on September 15; the 250,000-ton unit was stopped on October 11

Shanghai Yuanfang

56

Small line units began to be converted to slices in October, and other units started operating normally.

Xiamen Tenglong

25

The device was stopped for maintenance on December 15, warmed up and started in early March, and was officially shipped in the middle of March. It is currently under construction at normal times.

Jiangsu sanfangxiang

350

A set of 200,000 tons of equipment was stopped. In late September, the manufacturer stopped 700,000 tons of equipment.

Xinjiang Lanshan tunhe

6.5

The plant is currently under construction normally, and a new production capacity of 100,000 tons is planned to be put into operation in November.

China Resources

210

Under high raw material pressure, China Resources slightly reduced the start of its 2.1 million tons polyester bottle sheet unit

wankai

300

In late September, the start-up of the Wankai plant in Chongqing dropped to 80%, and a 250,000-ton plant in Haining was switched to production and slices.

Guangzhou Taibao

40

The unit is currently operating normally

Jiangsu Baosheng

15

The unit is currently under construction at a low level

Yisheng

270

The unit is currently operating normally

Henan Anhua

30

A 150,000-ton unit stopped on September 18

Guangdong Fanya

30

The device was stopped in late August, and the specific recovery time is undetermined

Liaoyang petrochemical

10

The device was switched to production and sliced in mid-January

Fujian billion

70

It was put into operation successfully on August 19, and the current construction operation is 50%-60%