[Polyester Bottle Sheet] Device Dynamics of Chinese Polyester Bottle Sheet Enterprises
enterprises |
Production capacity (10,000 tons) |
maintenance plan |
China Resources Jiangyin |
120 |
One set of 600,000-ton units was shut down for maintenance in early October, and the other set of 600,000-ton units was started at a low level |
Yizheng chemical fiber |
45 |
A 150,000-ton unit was switched to production and sliced on September 15; the 250,000-ton unit was stopped on October 11 |
Shanghai Yuanfang |
56 |
Small line units began to be converted to slices in October, and other units started operating normally. |
Xiamen Tenglong |
25 |
The device was stopped for maintenance on December 15, warmed up and started in early March, and was officially shipped in the middle of March. It is currently under construction at normal times. |
Jiangsu sanfangxiang |
350 |
A set of 200,000 tons of equipment was stopped. In late September, the manufacturer stopped 700,000 tons of equipment. |
Xinjiang Lanshan tunhe |
6.5 |
The plant is currently under construction normally, and a new production capacity of 100,000 tons is planned to be put into operation in November. |
China Resources |
210 |
Under high raw material pressure, China Resources slightly reduced the start of its 2.1 million tons polyester bottle sheet unit |
wankai |
300 |
In late September, the start-up of the Wankai plant in Chongqing dropped to 80%, and a 250,000-ton plant in Haining was switched to production and slices. |
Guangzhou Taibao |
40 |
The unit is currently operating normally |
Jiangsu Baosheng |
15 |
The unit is currently under construction at a low level |
Yisheng |
270 |
The unit is currently operating normally |
Henan Anhua |
30 |
A 150,000-ton unit stopped on September 18 |
Guangdong Fanya |
30 |
The device was stopped in late August, and the specific recovery time is undetermined |
Liaoyang petrochemical |
10 |
The device was switched to production and sliced in mid-January |
Fujian billion |
70 |
It was put into operation successfully on August 19, and the current construction operation is 50%-60% |