99% of new energy car owners are concerned about charging issues, installing charging piles? Please keep this guide carefully
In recent years, new energy vehicles are in full swing, ah, many car owners are going to the green card unlimited number, and many car owners are trying to save money. New energy vehicles are good anywhere, but many people are not used to changing from fuel trucks to new energy vehicles. Especially with the rising weather in summer, charging at high temperature is easy to cause safety risks, so the knowledge of electricity does not come to learn. Well, today I will teach what I have learned all my life, and talk about how to charge correctly.
If you want the right electricity, the first charging equipment can choose to come to Luming without a product, and do not install the filling wire or plug privately, which is always in danger.
The charging site must choose an open area with good ventilation to avoid charging under fire and damp conditions. It is recommended to choose slow charging when the environment is below 35 degrees and below minus 5 degrees.
Before charging, we can check the portable emergency charging line and charging gun for foreign body, damage and so on. If our car has had a chassis bump, or wading for a long time, be sure to check at the station in time, and it is recommended to check the power battery at least once a year.
The knowledge of charging safety has been learned, but there are still many people who do not even have charging piles and have to grab charging piles at four o’clock in the morning.
With the increasing popularity of new energy vehicles, in the case of a large price difference between commercial and household appliances, it is naturally preferred to install private charging piles in their own parking spaces.
However, after joining the army of new energy car owners, I found that installing charging piles would encounter a lot of obstacles and sweep away the joy of buying a car, so they did a lot of homework. What’s the difference between a professional outfit service and a job search? What is the process of charging pile installation? I circle continue to come and talk to home.
Many car owners think that it is convenient and cheap to find an electrician for construction, so they find an electrician on their own. Many electricians will not put pipes on the cables, which will lead to a lot of safety risks. Some daily charging failures, such as charging pile failure, cable, fuse, etc., charging pile damage, vehicle failure, charging pile fire. In fact, this is all due to the improper electrical work of the safety process.
Moreover, when looking for an electrician, the car owner can not understand the qualification of the electrician and the familiarity with the installation of the charging pile, so that the problems in the installation process and the use of the charging pile can not be judged and solved.
After doing a series of homework, I found that installing the charging pile is not as simple as installing electrical appliances such as air conditioners, and it takes too much energy to solve it step by step, so I finally decided to find the installation team of iCarService to install it.
How can I get the installation license smoothly? For the installation of electric piles, at least it involves the joint cooperation of power supply and property departments to obtain the installation permission. first of all, it is necessary to communicate with the property and ask them to give you an installation license and seal. The iCarService team can communicate with the property, and can also show the installation capital and other needed materials. The service attitude is good and saves a lot of worry.
How to apply for an electric meter from the State Grid? First of all, you need to go to the national network APP or submit a national network application meter to 95598, but it is also troublesome for many people to apply for an application form while you go to work. ICarService can help you with the national net pile. Assist you to deliver a series of certificates such as property right certificate, share certificate, purchase certificate and parking permit construction certificate.
How long will it take before someone comes to install it? After submitting the meter, you can make an appointment on the iCarService platform with one click. They have a dedicated butler service, within 24 hours to confirm the door-to-door time with you, the whole program to accompany, special personnel to follow up.
After booking the door-to-door time, iCarService installers will conduct door-to-door survey and draw construction drawings, so that they do not have to worry about after-sales problems such as Jerry-building, arbitrary charges, installation without warranty and so on. They will be very clear about the project and the possible additional costs. The installers all hold the electrician’s certificate, wear insulating clothes and carry unified purchasing professional tools to do the work. Moreover, there are still 2 years of installation and protection after the installation of the charging pile on the iCarService platform, so the problem can be solved in 24 hours, isn’t it very convenient and fast? Do not find, find the right electric pile installation company, you can successfully install the charging pile to get twice the result with half the effort.
Today, Chery New Energy charging pile and charging pile installation service has been launched on the iCarService platform. For the sake of safety and convenience, it is recommended that people who have not installed home charging piles should install it. It is environmentally friendly, energy-saving, and can save a lot of money every year. The future of new energy vehicles is promising!
Recommended Suppliers